Recent Projects

Seaforce Properties

Excavation for a 50 foot long X 48 inch steel diameter pipe used for testing well heads for the offshore oil industry.
 

Preparation for initial lift of 50 foot 48 inch diamter pipe.




Lifiting Installation of the 50 foot 48 inch diamter steel pipe



Irving Topsail Road/Burgeo Street

Area excavated for removal old Gas Tank, hole de-watered for installation of new Gas Tank and backfill of finished lot.






























CIBC Bank Stavanger Drive












Multi Purpose Trail City of St. John's



















Burton's Pond
















Sidewalk Repair